New Reduced price! View larger

ISA-77.13.01:1999 (R2008)

New product

ISA-77.13.01:1999 (R2008)

Fossil Fuel Power Plant Steam Turbine Bypass System

More details

$24.60

-59%

$60.00

More info

This standard covers the design requirements and operator interface for steam turbine bypass systems for drum and once-through steam generators and combined cycle plants. Hardware configurations are suggested to obtain the minimum design requirements to obtain a safe and operable system. Both fixed percentage bypass and variable pressure systems are covered. It is applicable to boilers with steam capacities of 200,000 lb/hr (25 kg/s) or greater.This standard establishes the minimum requirements for design specifications to implement steam turbine bypass systems and hardware configurations for drum and once-through, fossil fuel power plant boilers. The turbine bypass system should provide for cold start-up, warm start, hot restart, load rejection, turbine shutdowns, and unit trips. The system shall be designed to provide pressure, temperature, and flow control of steam around and through the turbine by controlling each bypass valve, isolation valve, and associated desuperheater. The desuperheating function may be integral with the bypass valve. The turbine bypass system does not interface with the turbine control and supervisory system. The turbine bypass system is set to maintain steam pressure, and any coordination with the turbine is through interaction with the process as the turbine demands more or less steam. There is no direct interconnection of control systems.

Author ISA
Editor ISA
Document type Standard
Format Paper
Confirmation date 2008-01-01
ICS 27.040 : Gas and steam turbines. Steam engines
27.100 : Power stations in general
Number of pages 42
Cross references ANSI/ISA 77.13.01 (1999), IDT
Weight(kg.) 0.1714
Year 1990
Document history
Country USA
Keyword ISA 77,ISA-77,77,ANSI/ISA-77.13.01,ANSI/ISA-77.13.01-1999, ISA77,77,ANSIISA771301,ANSIISA7713011999,ISA771301,ISA7713,7713,771301